Slip remediation following 2023 Auckland Anniversary Floods. Groundfix were engaged to complete the construction of a reinforced concrete in-ground palisade wall, to remediate a slip at a residential property which occurred during the 2023 Auckland Anniversary Weekend floods. The scope of the works involved installing 19 piles, 450mm and 600mm diameter and up to 10m… Continue reading Stanley Road – Devonport
Archive.php
Author: webadmin
Arney Road – Remuera
Significant slip repair following substantial storm damage in the 2023 Auckland Anniversary Weekend floods. The weather events caused a large piece of land to slip away from the existing house and swimming pool, leaving the house foundations unsupported, and at risk of further damage from future weather events. The property was yellow stickered by Auckland… Continue reading Arney Road – Remuera
Harapaki Wind Farm
Meridian’s Harapaki wind farm is the second largest in New Zealand. As part of construction of the main access road into the wind farm numerous slopes required significant stabilisation works. Engaged by the Joint Venture construction team of Hick Bros and Spartan Construction, Groundfix were challenged with the task of installing over 16,000 lineal metres… Continue reading Harapaki Wind Farm
Portland Road Subdivision
Winner of the 2022 Category C award (Any company turnover, Projects between Warkworth and Pokeno valued $0 – $20 million) at the Auckland CCNZ HYNDS Construction Awards Portland Road was a major stepping stone for Groundfix, taking on a full development package of works. This project had it all – large portion of design &… Continue reading Portland Road Subdivision
Te Ara o Te Ata: Mt Messenger Bypass
Ground-breaking work on the Te Ara o Te Ata: Mt Messenger bypass. Groundfix were appointed by the Mt Messenger Alliance to install multi strand ground anchors; to hold a 1.1 kilometre cableway allowing Waka Kotahi and its partners to start construction of the Te Ara o Te Ata: Mt Messenger Bypass. Using a 28-metre-high central… Continue reading Te Ara o Te Ata: Mt Messenger Bypass
Beach Road Overpass
Groundfix was engaged by Fulton Hogan on the Papakura to Drury motorway extension project, completing an enabling works package to allow widening of SH1. Scope involved the removal of the existing abutment, and stabilisation of the cut face with 10m soil nails and shotcrete. Works were staged to prevent comprising the stability of the bridge.… Continue reading Beach Road Overpass
Te Ahu a Turanga
As part of temporary works to allow access for HEB Construction to build Pier 3 on Bridge 2 on the Te Ahu a Turanga project across the Manawatu River, a 10m retained height retaining wall was required to support the railway above. Groundfix was engaged to complete the installation of 13no temporary strand anchors to… Continue reading Te Ahu a Turanga
SH1 Puhoi to Warkworth
The Ara Tūhono motorway provides a safer, more resilient and reliable route between Pūhoi and Warkworth connecting Tamaki Makaurau to Te Tai Tokerau. The new route was cut through significant landscapes, Groundfix’s specialist crews worked throughout construction, completing stabilisation of the cuts involving rope access, drilling, and meshing works across the length of the new… Continue reading SH1 Puhoi to Warkworth